Ellesmere Port, Liverpool – England

1 min read
Nov 2, 2016 2:33:00 AM

The athletic track at Ellesmere Port underwent 4 weeks for track resurfacing which included repairing 200 linear metres of cracks and a removing a large area of subsidence and repairing the tarmac below. The whole track was then resprayed using 2 x coats of red textured spray. New lines and events were then surveyed and painted giving the track a total transformation.

ellesmere-P-1ELLESMERE-P-1-1

Get Email Notifications

No Comments Yet

Let us know what you think